Gallery

Gallery: work in progress and finished

Filter by category and select any image to view it full size.

Gallery

Worker machine-plastering walls during a renovation
Machine-applied plaster on brickwork
Room with freshly plastered walls and props
Plastered walls, ready for the next trade
Bedroom with fresh plaster and two windows
Plaster finished before skimming
Brick corridor with plastering machine
Corridor prepared for plastering
Plastered room with steel props
Masonry phase with props
Block partitions and metal ceiling framing
Ceiling framing over new partitions
Suspended-ceiling profiles over a plastered room
Suspended-ceiling structure
Plastered corridor with service chases
Plastered corridor, services in progress
Plastered corner with corner bead
Corner finished with a bead
Built-in wardrobe with white shelves and blue wall
Made-to-measure built-in wardrobe
Worker fitting ceiling boards with a board lifter
Fitting boards with a board lifter
Suspended ceiling being fitted with framing and boards
Suspended ceiling half-fitted
Plasterboard alcove with shelves
Shelving built into the partition
Board ceiling across a large open room
Continuous ceiling in an open-plan space
Open-plan space with suspended ceiling and framing
Open-plan space during works
Clay brick partition under construction
Brick partition walls
Corner of a clay brick partition
New layout in brick
Brick partitions to reconfigure the layout
Reconfiguring the layout
Brick partitions with a door opening
Door openings in new partitions
Stair finished in a light tone with metal balustrade
Finished staircase
Living room with floating staircase and stone wall
Living room with floating stair
Staircase with floating timber treads
Floating timber treads
Floating black stair treads over seamless floor
Floating stair treads
Recessed-cove ceiling with LED strip, being finished
Cove ceiling with LED in progress
Wall with decorative finish and black cooker hood
Decorative wall finish
Hallway with lit cove ceiling and decorative panel
Cove ceiling in the hallway
Bedroom with tufted wall panel and indirect ceiling light
Bedroom with tufted feature wall
Living room with indirect-light ceiling and decorative panels; worker on ladder
Living room ceiling, final touches
Room with lit ceiling and illuminated shelves; worker on floor
Lit shelves and cove ceiling
Corridor and stair at works stage
Corridor and stair under works

FAQ

Frequently asked questions

Can I use a photo as a reference?

Yes. Send it with photos of your unit and the approximate floor area.

Why are there so many in-progress photos?

Because in commercial fit-outs the framing and services matter as much as the finish.

Are the photos from real jobs?

Yes, all of them are from our own team’s work.

Do you show client names or addresses?

No, for privacy reasons.

Are the images edited?

Only optimised for the web; the content is unaltered.

Do you do all the work shown?

Yes, within jobs we coordinate, with authorised partner installers for electrics.

Can you replicate a particular ceiling?

Often, depending on height and services. We confirm at the visit.

Do you do shop frontages?

We handle the interior. Changes to the façade need the community’s and the town hall’s approval and a specialist for glazing.

How do I request a quote?

Through the form, on WhatsApp or by calling +34 613 656 443.

Where is your office?

Avenida Antonio Belón 3, 29602 Marbella.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?